Problems, problems.
FedEx said delivery would be on Friday. Then Monday,
then Tuesday, and finally it was delivered on Wednesday.
I wasted a lot of time waiting for the delivery.
Next, the ZON-0600 arrived damaged. No damage to the shipping box, but the line transformer had broken loose from the circuit board. HBX said they would repair it for a cost of about $50. I could not wait another two weeks and successfully made the repair myself. The ZON-0600 was not sturdy enough to survive a 9-day truck ride. Suggest air shipments in the future.
None of this is the fault of Controls Depot, but I thought you should know.